Docs

Move Schedule Block

PUT /procurement-resources/{sourceResourceId}/schedule-blocks/{blockId}/move/{targetResourceId}

PUT/procurement-resources/{sourceResourceId}/schedule-blocks/{blockId}/move/{targetResourceId}

Moves a schedule block to another need and sets its new start and end times. The block keeps its id, request links, area and collaborator, and both needs are re-evaluated. Refused when the target is the same need or a composite parent.

Path Parameters

FieldTypeRequiredDescription
sourceResourceIduuidRequired
blockIduuidRequired
targetResourceIduuidRequired

Request Body

FieldTypeRequiredDescription
startDateTimedate-timeOptional
endDateTimedate-timeOptional