Docs

Copy Schedule

POST /procurement-resources/{sourceResourceId}/copy-schedule/{targetResourceId}

POST/procurement-resources/{sourceResourceId}/copy-schedule/{targetResourceId}

Appends a copy of every schedule block on the source need to the target need; advance-request links are not copied. Returns the number of blocks copied. Refused when source and target are the same need or either is a composite parent.

Path Parameters

FieldTypeRequiredDescription
sourceResourceIduuidRequired
targetResourceIduuidRequired

Response

Type: integer